Reference

Personal Reference List

No Nama Paket Pekerjaan Bidang/Sub Bidang Pekerjaan Lokasi Pemberi Tugas/ Pengguna Jasa Kontrak/Tahun
Owner/Mainkon/Subkon Alamat
1 BWRO plant Cap 4 M3/hrs CocaCola Padang WTP System Padang PT. Coca Coal Amatyl Padang Padang 2001
2 Water Softener Cap 60 M3/Hrs Softening Water Medan PT. Coca Coal Amatyl Medan Medan 2001
3 Dong Jin Wastewater Treatment Plant Cap 1000 m3/day Waste Water treatment Cilegon PT. Dong Jin Indonesia Cilegon 2002
4 Bogasari Reverse Osmosis Package Cap 6.8 M3/Hrs Reverse Osmosis system Tanjung Priok PT. Bogasari Fluor Mills Jakarta 2003
5 Abbot Wastewater Treatment Plant Cap 25 M3/Day Waste Water treatmeant Cimanggis PT. ABBOT Indonesia Bogor 2003
6 Water Treatment Plant Cap 22 Lps WTP System Perak PT. Artha Envirothama Surabaya 2004
7 Sea Water Treatment Plant Cap 100 M3/day Reverse Osmosis system On Boat Papua PT. Penta Ocean Papua 2005-2006
8 Ultrafiltration Plant Cap 30 M3/Hrs WTP System Pantai Indah Kapuk PT.Sinar Mas Jakarta 2006
9 Sea Water Treatment Plant Cap 3000 M3/day Reverse Osmosis system Pecatu Pecatu Indah Pecatu Bali 2007
10 Demineralized Plant Cap 5 M3/Hrs Demin System Karawang PT. TVS Motor Jawa Barat 2007
11 Multi Stage Reverse Osmosis System Cap 2 x 15 M3/Hrs Reverse Osmosis system Perak PT. Indonesia Power Surabaya 2007-2008
12 DBOT Project : Uprating WTP 75 lps to 300 lps with
LAPI ITB, Optimalization Existing Plant, Pipeline
(Transmission, Distribution , Reticulation)
WTP system Pangkal Pinang PDAM Pangkal Pinang Bangka Belitung 2008-2010
13 Design Built Produced Water Treatment Plant Cap
55.000 Galloo / day
WTP & WWTP system Jatibarang Pertamina EP Cirebon 2010-2012
14 EPC Project , Design and Built WTP 150 lps with Scada
System, Concrete K350 Built design.
WTP System Kerawang PT Mitra Kerawang jaya Kerawang 2012-2013
15 EPC Project , Design and Built WTP 265 mcph
(40000BWPD)
Re-Used System Palembang PT. Promatcon Tepat Guna Jakarta 2012-2013
16 New Water Treatment Plant Cap 500 Lps WTP system Tangerang PDAM Kota Tangerang Tagerang 2012-2013
17 Design & Consulting new Water Treatment Plant Cap
100 lps
WTP system Cibuntu PT. Waterindo Pam Mandiri Cikarang 2015